Santa Luzia Dam - Pampilhosa da Serra
What to Do
The Santa Luzia Dam is located in the Central Region of Portugal, in the municipality of Pampilhosa da Serra, parish of Fajão-Vidual, next to the town of Casal da Lapa. It was designed by André Coyne and built on the bed of the Rio Unhais in a narrow quartzitic gorge and has hydroelectric use. It was inaugurated in 1942, taking eleven years to build. Construction began in 1931 and in 1934 the dam was lifted, which ended in March 1935. It is 76 meters high and has a crowning length of 115 meters.
The Santa Luzia watershed has a surface area of 50 km2 and also receives water from the Alto Ceira Dam, channeled through a 6,945-meter long bypass tunnel. Work on the dam ended in 1942 with the closing of the floodgates in November of that year by Companhia Eléctrica das Beiras. The hydroelectric power station is built in the town of Esteiro, 3.5 kilometers from the dam, and has 4 generator sets with a total power of 24 MW, producing 55 GW-h in a normal year. The hydroelectric plant has the particularity of discharging the turbined water directly into the Zêzere River. Bottom discharge and emergency discharge remain in the Unhais River.